Contact

Become a partner

Are you looking for a suitable solution?

Loading...

Efficient charging for the fleet's needs

Leipziger Stadtwerke is supporting the electrification of fleets with a new company charging park at Leipziger Wasserwerke's Probstheida water supply facility: The new charging park in the south-east of the trade fair city deliberately combines high-power charging and normal charging to meet the needs of Leipziger Wasserwerke's vehicle fleet.

The eTower 200 from Compleo, which offers two charging points with a total of up to 200 kW and thus enables fast charging for short stops, is at the centre of the charging location. The offer is complemented by ten DUO fleet stations, which provide a total of 20 charging points for normal charging and are ideal for longer parking times for fleet vehicles - for example overnight.

Find out more about the DUO fleet  product and the power rail technology used. 
Find out more about the eTower product.

 

Adam Fiedler,
e-mobility manager at Leipziger Stadtwerke:

 

‘We have been working successfully with Compleo hardware for our charging locations for years. The combination of AC, DC and HPC solutions allows us to customise the setup and use it flexibly for different requirements.

Here at the Leipziger Wasserwerke site, we were able to successfully install the 10 AC and 1 HPC charging station for the e-fleet. The integrated load management not only helped us to make optimum use of the existing grid connection capacity, but also enabled us to fulfil the requirements as controllable consumption facilities.’

Loading...

Commissioned by

Stadtwerke Leipzig

Loading...

Hardware

1x eTower 200,
10x DUO fleet

Loading...

Place

Leipzig, GER

Loading...

Backend

Taubert Consulting

Loading...

Operating since

January 2025

Loading...

Use case

Closed usergroup

Loading...

Load management for optimal energy distribution

An outstanding feature of the Compleo technology is the onboard load management, which balances both AC and DC charging processes in one system - without additional software or external control. Leipziger Stadtwerke was able to configure the load distribution directly via the Compleo tool DUCTO during commissioning. The waterworks' fleet benefits permanently by allocating the maximum available charging power to all vehicles without overloading the grid connection.

Loading...

Space-saving and cost-efficient installation

Another advantage of the Compleo solution is the well thought-out installation, which brought benefits for Leipziger Stadtwerke. The eTower 200 does not require any additional open space for maintenance, which means that more parking spaces are retained. The DUO fleet stations were efficiently integrated with just three connection lines. Thanks to the Power Rail technology, series cabling was possible, which significantly reduced both material costs and installation work. In addition, the company charging park can be flexibly expanded so that any future requirements can be easily taken into account.

Loading...
Loading...
Loading...
Loading...